Webster

The Constitution was made to guard the people against the dangers of good intentions." --American Statesman Daniel Webster (1782-1852)


Showing posts with label Vietnam. Show all posts
Showing posts with label Vietnam. Show all posts

Friday, May 24, 2024

Vietnamese Activist are furious that LA county is making April 30th "Jane Fonda" Day.

 I can't believe that someone on the Los Angeles Government was so tone deaf but to make "Jane Fonda " day the same day Saigon fell effectively ending the long running Southeast Asian war was an accident.  I believe this was by design, there are a lot of Marxist in that government and Marxist always do things by historical dates.  April 30th was a highwater mark for the communist movement, they had forced a major American ally to surrender and humiliate America in the process.  THis was an opportunity to use symbolism again to close a loop and in a round about way humiliate the Imperialist Americans again using the hated symbol of "Hanoi Jane" and on the same day that Saigon Fell?   Perfecto!!!.  


jane-fonda-north-vietnamRichard Shotwell/Invision/AP, History/Universal Images Group via Getty

19 May 2024736

3:00

Vietnamese activists in L.A. are furious over the county’s declaration of April 30 as “Jane Fonda Day.”

Only days after county officials announced the homage to the 86-year-old actress, members of the Vietnamese community were outraged.

Activists immediately retaliated against the celebration by dubbing the month as “Black April,” referring the fall of Saigon, according to the Los Angeles Times.

Fonda, who has been denigrated as “Hanoi Jane” for decades, is notorious not just for opposing the U.S. war effort but for actually traveling into North Vietnamese territory and giving aid and comfort to the Chinese-backed enemy.

“She may be a very strong activist for climate change, but besides that, we also view her as being a person who was very cruel to the rights of the South Vietnamese people during the antiwar protests,” said L.A. resident Phat Bui, chairman of the Vietnamese American Federation of Southern California.

Bui also sent a letter to county officials to change the date and added that choosing “such a date can inflict so much pain to our community and to the Vietnam War veterans.”

U.S. forces fled the South Vietnamese Capitol on April 30, 1975. Members of L.A.’s Vietnamese community gather every April 30 to memorialize that dark day.

Republican State Sen. Janet Nguyen blasted the county, saying Fonda Day was “alarming and profoundly disrespectful to over half a million Vietnamese Americans in California.”

Rep. Michelle Steel, also a Republican, also blasted the county.

“To elevate Hanoi Jane over the Vietnamese Community, Americans who sacrificed their lives, and the loved ones they lost to communism, is deeply offensive to the freedom-loving Vietnamese Americans who bear such tragic and painful memories of the Vietnam War,” Steel said.

With all the pressure over the offensive choice of dates, the county’s board of supervisors agreed to move the date and is now considering April 8 instead. The board also insisted that the choice of April 30th for Fonda’s honors “was unintentional.”

Fonda, who spent many years refusing to apologize for her aid to the Communists, did relent later in life. In 2013, she admitted to making a huge mistake posing for her infamous photos alongside North Vietnamese soldiers in 1972.

“I made one unforgivable mistake when I was in North Vietnam, and I will go to my grave with this,” she said at the time, adding, “I don’t know if I was set up or not.” “I was an adult. I take responsibility for my actions…”

She has also said she often apologizes to American Vietnam veterans whenever she meets them.

Tuesday, August 30, 2022

The Analysis of the New airport planned for Ho Chi Minh City

 A few weeks ago I had posted a story about a "Airport/MRO" being built near Ho Chi Minh City, Now here is an expansion of the initial report.  I thought it was very enlightening.  Like I stated, I see the possibilities, if the Vietnamese can get it going, they can pull some major money away from the Chinese whom they really don't care for.  A lot of airlines including my employer send planes over there for overhaul.  I personally don't agree with that decision, but it isn't my call to make.  The Chinese don't work in nobody's interest but their own to the detriment of everyone else.


Construction of Vietnam’s USD16 billion, 100 million passenger per annum new airport for Ho Chi Minh City, the most populated city-region in the country, is at last under way, seven years after it was first mooted.

It will be one of the largest airport projects in the Asia Pacific region and the most expensive piece of infrastructure in Vietnam’s history.

Even now, it is subject to further possible delays as the government grapples to get 40 transport infrastructure projects back on track, some of them in preparation for an anticipated surge in foreign visitors.

But the most pressing issue remains the need to get the private sector on board; if not now, at least when the airport is operational, and there might be an opportunity for PPP financing and operation of future terminals.

Summary

  • Formal construction work to start on Long Thanh airport, Vietnam, in Oct-2022.
  • It is the most expensive infrastructure project in the country’s history.
  • One of many transport infrastructure projects that have fallen behind schedule, including a high-speed rail link – the government takes remedial action.
  • The new airport may be directed towards foreign airline movements.
  • Careful thought should be given to the need for an airport city.
  • The government still wants to work with the private sector both here and at other airports, but the ‘pitch has been queered’ somewhat by previous events.  

Long Thanh construction work to begin in Oct-2022: 4000m runway and a terminal building 

Airports Corporation of Vietnam (ACV) announced that construction of the Long Thanh International Airport's passenger terminal will start in Oct-2022.

Piling work for the passenger terminal was completed one month ahead of the schedule and more than 14 million cubic metres of soil has been dug, filled and levelled.

Long Thanh Airport's construction is divided into three phases, with the first phase to include development of the terminal, a 4000m x 60m runway and facilities to accommodate 25 million passengers and 1.2 million tonnes of cargo per annum.

The airport is now expected to be completed in 2025, in its first stage. It will eventually be able to handle up to 100 million ppa.

Most expensive infrastructure project in the country’s history

The airport is the most expensive infrastructure project in Vietnam's history and it will replace the existing Tan Son Nhat International Airport as the city's main airport.

The first phase is costed at USD7.8 billion, with the eventual bill running to more than USD16 billion – which at today’s values would make it one of the most expensive in the world.

Location of Long Thanh Airport to the west of Ho Chi Minh City, Vietnam

Source: Wikipedia.

It has been a long, hard road to get this far.

In Vietnam breaks ground on Long Thanh airport: big ambitions, a CAPA report published in Jan-2021, it was revealed that the ground had finally been broken on the airport six years after it was first mooted.

At the beginning of Aug-2022 Vietnam's Prime Minister Pham Minh Chinh directed the Dong Nai Provincial People's Committee to complete site clearance for the airport within the month.

Governing bodies and investors were urged to speed up approval of the design and construction of the main works to ensure that the plan is met. They were also directed urgently to select investors to deploy service works and ensure on-time completion.

One of many transport infrastructure projects that have fallen behind schedule 

The airport is not the only project that is lagging behind. In total 40 others in total include: road construction throughout the country, including two key ring roads, the high-speed rail line running on the north-south axis, and numerous other urban rail lines.

The government statement made clear that the amount of work that needs to be done is “very large,” and that the implementation time is “urgent,” so there is a need for direction, administration and coordination of activities among ministries, branches and localities.

Therefore, the establishment of a State Steering Committee was declared to be “essential”.

Existing airport was built during the Vietnam War – 40mppa in an airport built for 25mppa

An overall strategic transport infrastructure projects budget of VND734 trillion was set.

Finding a replacement for Tan Son Nhat (TSN) has also taken on an air of urgency. Tan Son Nhat is currently the only international airport in the Ho Chi Minh City Metropolitan Area, which covers 30,400 square kilometres (11,740 sq miles) and has an estimated population of 20-22 million inhabitants.

TSN was built during the Vietnam War to support war transportation, hence its location inside the crowded Ho Chi Minh City, where expansion is limited.

Owing to location and safety issues, it is difficult to expand the airport to meet the increasing annual growth of passengers. The maximum design capacity of Tan Son Nhat is 25 million passengers per annum, but in 2018 it exceeded 40 million and continued that way the following year, before the COVID-19 pandemic.

Ambitions multiply as Vietnam envisages over 200 mppa by 2038

The new airport was originally intended to supplement capacity at TSN but ambitions have gone beyond that, as Vietnam might now attract more than 205 million air passengers by 2038 (according to the most recent estimates).

Room for improvement in the network

There is room from improvement in the route network currently offered at TSN, as the network map below indicates.

The network is heavily oriented towards Southeast Asia and Australasia, with a mere handful of flights to Europe and just one to North America.

There are no flights connecting Latin America or Africa at all (although both will be connected via the Middle East).

Network map for Tan Son Nhat airport (TSN), Vietnam

Source: CAPA - Centre for Aviation and OAG.

But it is direct flights that drive the tourism from new markets.

The suggestion is that Vietnam Airlines will be the only Vietnamese airline to operate domestic flights at Long Thanh, while international services will only be operated by other airlines – suggesting that TSN will be Vietnam Airlines’ main base for a while after the new airport opens.

The existing airport has recovered from the COVID-19 pandemic downturn

As the chart below shows, TSN has recovered from the COVID-19 pandemic-influenced downturn, with effect from the second week of Jul-2022, when 2019 seat capacity levels were reached.

As that target has more or less been reached throughout the country as well, efforts can restart to attract the previously aspired-to level of tourism growth.

Ho Chi Minh City Tan Son Nhat Airport: weekly total system seats capacity, 2019-2022

Source: CAPA - Centre for Aviation and OAG

Government still seeks to work with the private sector, but it remains wary

The government’s comments about the need to ‘select investors to deploy service works’ requires clarification as it probably means the hiring of private contractors to complete these works rather than actual investors into the project.

Under current plans by the Vietnamese government, the Airports Corporation of Vietnam (ACV) will be the main investor in, and operator of, the airport, with The Southern Airports Corporation (a company registered under the Ministry of Transport) in charge of development of this project.

Financing has been an issue throughout, and much of it will come from the public purse, together with what loans can be engineered. The private sector looked as if it would play a major role at one time, but that possibility has diminished considerably since France’s Groupe ADP withdrew from a wider investment in Vietnamese airports.

In 2015 ADP was reported to be partnering with Credit Suisse in raising approximately USD3 billion for the Long Thanh International Airport development.

But eventually Groupe ADP’s interest in Vietnam as a whole diminished, following its failure in 2017 to secure a strategic investor stake in ACV and its 22 airports across Vietnam.

Groupe ADP had looked to tie up a deal with ACV whereby Groupe ADP would acquire a 7.4% equity stake, later 20%, and make long term investments there. An open sky policy between Vietnam and France was also on the cards.

Since then, the Ministry of Transport has consistently called for domestic and foreign private companies to invest in the project under public-private partnership arrangements. But following the pull-out by Groupe ADP, none of this has transpired.

It may well be that ACV’s strategy now is to finance the first stage of the airport from its own funds and loans (terminal, runway and other basic infrastructure), in the hope that it can then later attract private firms to co-operate by leasing one or more terminals or by entering into PPP deals to build and operate others.

The airport will eventually have four runways and four terminals unless it is scaled back, so there will be plenty of opportunities.

High-speed rail subject to the same hold-ups

A new high-speed rail service is proposed to be connected to the new airport as part of the Ho Chi Minh City-Nha Trang section of the North-South high-speed railway line (the one referred to earlier, which is also a matter of concern to the government and in need of being ‘speeded up.’)

The rail service will give passengers a more direct and efficient transit option to Ho Chi Minh City than there is by road, and the roads are already congested closer to the city centre.

Vietnam's Deputy Prime Minister Le Van Thanh insisted competent agencies should be assigned to invest in the 37.5km railway route from Thu Thiem in Ho Chi Minh City to the Long Thanh airport. Total investment would be approximately VND40.6 trillion and through a private public partnership method.

Airport City development announced - too ambitious?

Meanwhile, further details have been released about a strategy to develop three urban areas around the new airport.

The envisaged 'airport city' will be associated with infrastructure for economic restructuring, building new urban areas, industrial clusters, training centres for scientific research and tourism services.

That sounds less like a designated airport city than an ‘aerotropolis’ stretching far away from the airport estate – but such investments can be hard to justify unless and until an airport is operational and building large numbers of passengers and freight volumes.

Friday, July 29, 2022

Vietnam building new MRO facilities

 This is interesting,Many Airlines send their widebodies to China and Singapore for overhaul, with the hostilities going on, I wonder if many airlines will switch over because of the Chinese being hostile to foreigners in their country, I do know that they don't like the FAA(Friends Against Aviation) going over there to observe the overhaul operations  and made it extremely difficult for them to enter the country to the point that the FAA has to inspect the aircraft after it leaves China.  I wonder if "EASA" deals with the same problems and I'm pretty sure they are similarly restricted because the Chinese are being obstinate.  I also am putting this out there because it shows that the Vietnamese are serious about becoming major players in the aviation world and build their homegrown industry. and they have no love of the Chinese.  

 

Long Thanh

Rendering of a proposed New Long Thahn Airport near Ho Chi Minh City(SGN)
 

SINGAPORE—The Vietnamese Transport Ministry has approved an investment of VND2.7 trillion ($118 million) to develop four MRO facilities at the new Long Thanh International Airport that will serve Ho Chi Minh City. 

The facilities will be able to support aircraft as large as Code F—Airbus A380s and Boeing 747-8s—and comply with FAA, EASA and Civil Aviation Authority of Vietnam regulatory standards. 

An initial investment of VND688 billion will be allocated to each of the four projects, which will have plots of around 45,500 m2 (490,000 ft.2). Under a public-private partnership scheme, the concession period for the facilities will be around 25 years. 

The four-runway Long Thanh airport is currently under construction and is expected to be completed in 2025, when it will replace Tan Son Nhat International Airport. Vietnam Airlines Engineering is the primary MRO provider at Tan Son Nhat, which also has a joint venture with Singapore’s ST Engineering operating as Vietnam Singapore Technologies Engineering Aerospace.