This is the plane we are working one.....It is a Boeing 757
The twin-engine, medium-range 757 was up to 80 percent more fuel efficient than the older 727 jetliners it was designed to replace but retained the 727’s short-field capability. The 757-200 carried up to 228 passengers and had a range of approximately 3,900 nautical miles (7222 kilometers).
The 757 and the 767 were developed concurrently, so both shared the same technological advances in propulsion, aerodynamics, avionics and materials. The pioneering two-crew computerized flight decks, or “glass cockpits,” of the 757 and 767 are nearly identical, so pilots could easily qualify to fly both.
The first 757 rolled out of the Renton, Wash., factory in 1982. On March 29, 1991, a 757, powered by only one of its engines, took off, circled and landed at the 11,621-foot-high (3542-meter-high) Gonggar Airport in Tibet. The airplane performed perfectly although the airfield was in a box canyon surrounded by peaks more than 16,400 feet (4998 meters) high.
In 1996, the company launched the 757-300. It seated up to 280 passengers and had about 10 percent lower seat-mile operating costs than the -200. The first 757-300 was delivered in 1999. By then Boeing had delivered more than 1,000 757s. Four 757s were modified as replacements for the older 707-based VC-137 executive transports for government officials and designated C-32As.
In late 2003, Boeing decided to end 757 production because the increased capabilities of the newest 737s and the new 787 fulfilled the 757 market’s needs. On Nov. 28, 2005, Boeing concluded the remarkable 23-year run of the 757 passenger airplane by delivering the final one to Shanghai Airlines. The airplane was the 1,050th Boeing 757.
We are doing interior upgrades to the airplanes in our fleet. My employer charges a premium for the customer experience, the upgraded seats, WiFi and many creature comforts. The airplanes we are modernizing were to be tacky....stripped...they had seats in them...and that was it..The plane is a very good plane but the other company had different ideas on passenger aminities..the WiFi was added later after the merger. The version of the airplanes we are working on were originally "red tails". The Boeing's that are originally on our fleet are called "blue Tails". Those airplanes have more amenities for the airplane travelers. They have monitors in the headrest interactive games and movie selections and recharging ports for electronic devices and many other stuff that the legacy "red tails" don't. This is that the seats look like right after they are removed from the airplane
old seats...
We then start removing the seats, then we start removing the old over head bins..they are easier to remove once the seats are out of the airplane.
We have already removed the overhead ceilings, we will start removing the PSU's "Passenger Service Units" this has the flight attendant call button, the reading light and the emergency O2 masks. The ductwork that you see in the ceiling will be removed, cleaned, and reconfigured for the new mod.
We have removed the seats, the overhead bins, the ductworks and we have started the metal fabrications and antenna movement and installation for the WiFi and all the wiring for the electronics and passenger interactive games and videos and other stuff.
The sidewall panels are installed, the overhead bins are installed, we are starting to install the ductworks, the antenna for the WiFi is installed, the seats will be going in, the galleys and Lavatories are already installed.
This was the view from the back of the airplane, we have installed the ductworks and fixing to install the overhead ceilings. You can see the Lavatories. They use a LCD lighting or mood lighting.
, the carpets are installed.
You can see the huge difference in the interior modifications, this takes us about 45 days give or take to do the mods, this includes moving the mid lav from the left side to the right side. This is where my overtime comes from$$ The airplane gets a huge facelift and the customer gets the experience that they pay for. We call this stuff "arts and crafts" We make jokes about it but it is neat to see and it is considered a capital improvement and a benefit to our customers and us, it gives us long term job security as long as my employer remains ahead of the rest of the airlines, we will be the preferred carrier for the discerning customer who won't mind paying the extra coins for the extra amenities.
Nice behind the scenes look, MrGarabaldi. Thanks!
ReplyDeleteReally love seeing stuff like this. Worked at Gulfstream for about 9 months years ago. Never got inside, because if you didn't have a task, you didn't get to go into the customers planes.
ReplyDeleteDo you do goenginerring work.let me know.
ReplyDeleteNice look at the 'sausage' being made... Looks good, but I can't help but wonder what the weight penalty is to the ZFW of the birds.
ReplyDeletePretty fancy. I have to admit, it is alarming when the plane is torn apart. I hope I don't get that one. LOL.
ReplyDeletePretty fancy. I have to admit, it is alarming when the plane is torn apart. I hope I don't get that one. LOL.
ReplyDeleteHey Old AF Sarge,
ReplyDeleteIt is pretty neat to do stuff like that.
Hey Spike,
I also have a friend that worked Gulfstream in Savannah and he told me the same thing, Glad I don't work there;)
Mr Taylor....No I don't I am just an airplane Mechanic.
Hey Old NFO;
Believe it or not, Once we finish the planes, the weight is a little less. We weight it once the plane is finished. the new stuff weighs far less than the old monuments even with the additional electronics. and the new paint job...you would be surprised how much layers of paint we have to remove to get to the skin...and 12 layers of paint adds up in weight.
Hey Momma Fargo;
The plane isn't actually damaged, we are working inside the tube, we actually fix things we find wrong that you wouldn't normally see except in an overhaul. The plane is far better:)